|
Phase 1. Tearing down to old frame |
|
Phase 2. Frame jig’s made Phase 3. Starting frame rail alignment |
|
Phase 4. Setting up the rear housing with the aid of a level and a laser beam |
|
Phase 4. Setting up the rear housing with the aid of a level and a laser beam |